Building Permits in ZIP 10018
Manhattan, NY — 663 permits filed recently
663 permits
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicat...
Filing herewith to add hold opens connected to the fire alarm at two existing doors on the 5th and 6th floors.
Filing herewith to add hold opens connected to the fire alarm at two existing doors on the 5th and 6th floors.
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applicat...
Mechanical modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Sprinkler modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
General construction work to include construction of interior partitions and installation of doors and frames as shown on drawings. No change to use, egress or occupancy.
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Facade repairs include, but not limited to brick repair, repointing, lintel repair & waterproofing, stone repair, terra cotta repointing, sill replacement as per plans filed. No change in use egress o...
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
minor demo of mechanical systems (20th floor) and installation of new ductwork on the 21st floor (Highlife) as per plans filed herewith. No change to egress use or occupancy.
Filing herewith standpipe work at existing 7th floor space. No change in use, egress or occupancy.
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy
Filing for structural and general construction repairs to this existing parking garage. No change to use, occupancy or egress.
Proposed twelve (12) story + cellar mixed-use building.
Interior work as per plans. No change in egress use or occupancy
Filing for structural and general construction repairs to this existing parking garage. No change to use, occupancy or egress.
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy