Building Permits in ZIP 10018
Manhattan, NY — 676 permits filed recently
676 permits
Filing herewith plumbing work to existing 7th floor space. No change in use, egress or occupancy.
Dismantle & remove existing wall structure and associated signs as per plan. no change in use, egress or occupancy.
Propose new illuminated signages for existing commercial space. no change to use, egress or occupancy.
Installation, removal and relocation of sprinkler heads as per plans. No change to use, egress, or occupancy
Installation of temporary protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Remove 51 sprinkler heads and piping & install 48 new sprinkler heads and piping.
Structural work in Penthouse as per plans filed. No change in use, occupancy or egress.
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Restroom.) No change to...
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.) No change to use, e...
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egress or occupancy unde...
Filing herewith interior renovation on existing 7th floor space, United Hospital Fund. No change in use, egress or occupancy.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Structural work in Penthouse as per plans filed. No change in use, occupancy or egress.
Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
Modifications to the existing Sprinkler System: Remove (1) sprinkler head and Install (2) new heads and associated Sprinkler Piping on the 10th Floor as per plans (Hines - ADA Restroom.) No change to...
General construction modifications taking place on the 2nd and 3rd floors as per plans filed herewith. No change in use, egress or occupancy
Application file to install plumbing fixtures at partial 1st floor for haagen-dazs ice cream store as per plan. construction work under separate application. no change in use, egress or occupancy unde...
Plumbing Modifications: Install (1) HWH, (1) Water Closet, (1) Lavatory, (1) Funnel drain and associated CW/Sanitary piping on the 10th Floor as per plans. (Hines - ADA Restrooms.) No change to use, e...