Building Permits in ZIP 10018
Manhattan, NY — 663 permits filed recently
663 permits
interior modification to the retail layout of the 1st and 2nd floor CVS retail tenant spaces. remove non-load bearing metal stud walls, relocate retail fixtures, replace floor and wall finishes.
Proposed interior renovation at 003 floor as per plans. no change in use, egress, and occupancy. mechanical, sprinkler and plumbing to be filed separately.
Modify existing sprinkler system as per plans.
Install of temp tents, no alt to exist structures for Seasonal Bryant Park Grill. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed u...
Proposed eleven (11) story + cellar mixed-use building. (Cellar, 001-010 construction floors, 11C/PENM)
Proposed interior renovation at 014 floor as per plans. no change in use, egress, and occupancy. mechanical, sprinkler and plumbing to be filed separately.
Modify existing sprinkler system as per plans.
Proposed interior renovation at 003 floor as per plans. no change in use, egress, and occupancy. mechanical, sprinkler and plumbing to be filed separately.
Remove mini split units, associated piping and registers and diffusers from removed rooms.
Install of temp tents, no alt to exist structures for Seasonal Bryant Park Grill. A TPA is required. Producer is responsible to monitor site safety & implement HWAP. All production equipment removed u...
THE REMOVAL OF (2) EXISTING 310 TON STEAM ABSORPTION CHILLERS AND THEINSTALLATION OF (2) NEW 310 TON ELECTRIC CENTRIFUGAL MACHINES., A NEW SIDESTREAM SAND FILTER ON THE CONDENSER WATER SIDE, NEW SUPPL...
Propose to remove 48 sprinkler heads & piping. relocate 25 sprinkler heads & piping. install 53 new sprinkler heads & piping.
Sprinkler modifications to existing system related to Restaurant renovation
Facade restoration as per plans filed herewith. No change to use, egress or occupancy
Facade restoration as per plans filed herewith. No change to use, egress or occupancy
Propose to remove 48 sprinkler heads & piping. relocate 25 sprinkler heads & piping. install 53 new sprinkler heads & piping.
Sprinkler modifications to existing system related to Restaurant renovation
THE REMOVAL OF (2) EXISTING 310 TON STEAM ABSORPTION CHILLERS AND THEINSTALLATION OF (2) NEW 310 TON ELECTRIC CENTRIFUGAL MACHINES., A NEW SIDESTREAM SAND FILTER ON THE CONDENSER WATER SIDE, NEW SUPPL...
Plumbing work as shown on plans.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola