Building Permits in ZIP 10018
Manhattan, NY — 676 permits filed recently
676 permits
Replace oil burner on existing low pressure boiler. change grade of fuel oil from #4 to #2. no change in use, egress, or occupancy is involved under this application.
Suspended scaffold outrigger system for exterior facade painting works and inspection at 273 west 38th street, manhattan, ny 10018
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no change in use, egres...
Removal of old air conditioning units and replacement with new unit in kind.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Modifications to plumbing and sprinkler as per plans filed herewith. No change in use, egress, or occupancy.
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Interior non-structural renovation on partial 21st floor including demolition and construction of non-load-bearing partitions, new doors and frames, and interior finishes per approved plans. No change...
Perform mechanical work for an existing 42-story office building, design includes the installation of vrf heating and cooling systems and building exhaust and fresh air system. no change in use, egres...
Install plumbing fixtures and related piping. new: 6 wc, 6 lavs, 6 sinks, 5 dishwashers, 3 floor drains, 7 hwh non gas, 1 shutoff valve, 1 water piping & 1 sanitary piping.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Modifications to existing HVAC and ductwork as per plans filed herewith. No change to use, egress, or occupancy.
Install 189 new sprinkler heads and pipng.
Interior renovations and modifications as per plans filed herewith. No change to use, egress or occupancy
Install 189 new sprinkler heads and pipng.
Provide temporary shoring for the repair of roof slab as per plans. no change in use, egress or occupancy.
Mechanical work as per plans to include installation of one water cooled heat pump.
Interior renovations on teh 29th floor as per plans.
Modify ductwork.
Remove 155 existing sprinkler heads, install 11 temporary loop heads & install 106 permanent sprinkler heads and piping.