Building Permits in ZIP 10018
Manhattan, NY — 676 permits filed recently
676 permits
Demolition of (2)gas cooking appliance & (1)gas hot water heater
Installation of a code compliant railing at the rooftop as per the Department of Buildings' Cycle 9 FISP initial report & selective terracotta at the south facade. No change in use, egress or occupanc...
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Conversion of existing elevator shaft to debris chute as per plans filed herewith.
APPLICATION FILE TO INTERIOR RENOVATION EXIST. STORE AS REMOVE & INSTALL PARTITION, CEILING, FLOOR TILES AND STORE FRONT WORK AT 1st FLOOR FOR HAAGEN-DAZS ICE CREAM STORE AS PER PLAN. PLUMBING WORK UN...
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the Ground Floor as per plans (Hines - Retail Demo for Gregory's Coffee.) No change to us...
Plumbing work on the 12th and part of the 13th floor (Culture Fly) as indicated on drawings.
Interior renovation in existing 1st fl commercial space for proposed grocery & convenience retailer w/ commercial cooking. new commercial hood with exhaust. new condensers. plumbing work to be filed s...
Conversion of existing elevator shaft to debris chute as per plans filed herewith.
Minor interior demolition: Removal of interior partitions, doors, suspended ceilings, flooring and finishes on the Ground Floor as per plans (Hines - Retail Demo for Gregory's Coffee.) No change to us...
APPLICATION FILE TO INTERIOR RENOVATION EXIST. STORE AS REMOVE & INSTALL PARTITION, CEILING, FLOOR TILES AND STORE FRONT WORK AT 1st FLOOR FOR HAAGEN-DAZS ICE CREAM STORE AS PER PLAN. PLUMBING WORK UN...
Plumbing work on the 12th and part of the 13th floor (Culture Fly) as indicated on drawings.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Interior renovation in existing 1st fl commercial space for proposed grocery & convenience retailer w/ commercial cooking. new commercial hood with exhaust. new condensers. plumbing work to be filed s...
Installation of a code compliant railing at the rooftop as per the Department of Buildings' Cycle 9 FISP initial report & selective terracotta at the south facade. No change in use, egress or occupanc...
Slab infill of existing stair opening
Interior modification. Modifying the existing entrance door to install a push-button-actuated assembly for accessibility to the building.
Demolition of the existing convenience stair and restoration of the floor slab.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Filing herewith for structural scope for concrete pad, sloped, within the existing loading dock on existing slab as per plans. No change to use, occupancy, or egress under this application.