Building Permits in ZIP 10018
Manhattan, NY — 665 permits filed recently
665 permits
New plumbing fixture per plan for existing commercial space. Alteration on existing sprinkler system. No change in use, occupancy or egress.
Filing herewith minor construction work for 2nd floor passageway as per plans. no change in use, egress, or occupancy.
Interior mechancial work on 26 and 27th floors as shown herewith. no changes to egress, occupancy or use
Installation of temporary platform & debris chute for building construction. No change in use, egress, or occupancy.
Application filed to install new ductwork, new kitchen exhaust fan, and make-up air fan for commercial kitchen as per plans. fire suppression system filedseparately with the fdny. no change to use, eg...
Removal of HVAC systems to satisfy violation #34455707X
Plumbing modifications/additions in conjunction with gc # m01260479-i1.
Removal of old air conditioning units and replacement with new unit in kind.
Intallation of new 6 fire service, new dcda, and new 3 rpx.
General construction taking place on cellar & 1st fl as per plans filed herewith. no change in use, egress, or occupancy.
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
Intallation of new 6 fire service, new dcda, and new 3 rpx.
Removal of old air conditioning units and replacement with new unit in kind.
Installation of partitions and finishes, HVAC, installations and modifications, plumbing installations, and modifications, sprinkler and standpipe, installations, and modifications to structural, etc.
General construction taking place on cellar & 1st fl as per plans filed herewith. no change in use, egress, or occupancy.
Installation of 355 sprinkler heads (concealed and upright) on the 21st floor (HighLife) as per plans filed herewith. No change to egress, use or occupancy.
Partial renovation of the 25th floor and 24th floor. New partitions, doors and fixtures. No change to use, egress or occupancy.
Installation of interior non-loadbearing partitions and floor buildout as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of new plumbing fixtures on the 21st floor (High Life) as per plans filed herewith. No change to egress, use or occupancy.
Installation of suspended scaffold for facade work or inspection