Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Replace illuminated sign on existing marquee (spin)
Office renovation (tagwall) work to include partitions, ceiling and door modifications as indicated on plans. no change in use, egress or occupancy.
Plumbing modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Filing herewith for Temporary Standpipe as per plans (Provided one Temporary Standpipe with compressor and one fire department Siamese connection.
Installation of temporary construction fence, supported scaffold, and heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/o...
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing work as shown on plans
Pulitzer Fountain - civil work including the foundation around the fountain. No change of use, egress or occupancy.
Interior renovation and modifications as per plans filed herewith. no changeto use, egress, or occupancy
Mechanical demo and modifications on 10th floor. No change to use, egress, or occupancy.
general construction on the 18th floor as per plans filed herewith. no changes in use, egress or occupancy.
Modifications to the existing sprinkler system on the 20,21,22,24 Floors- (Orrick Buildout) as per plans. No change to use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under this application.
Modification to the existing plumbing system on the 17th floor as per plan. no change to use egress or occupancy
Minor work in existing commercial office space. Work to include Partitions, flooring, ceilings finishes and fixtures. No change in egress, use or occupancy.
Renovation of existing commercial space in partial first floor with general construction: install new partitions, floor/wall finishes. no change in use, egress or occupancy under this application.
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Modifications to the existing HVAC system on the 45th floor as per plans. No change to use, egress or occupancy.