Building Permits in ZIP 10019
Manhattan, NY — 1,284 permits filed recently
1,284 permits
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.
Replacement of the residential cooling tower and condenser water piping. no change to use, egress, or occupancy.
Interior renovation of existing apartment apt 602. no change no change of use, egress or occupancy.
Filing for facade restoration purposes only. no change to use, egress or occupancy.
Installation of mechanical systems as per plans filed. no change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Existing apartment renovation including partitions, finishes, and appliances. no change in use, egress, or occupancy.
Installation of a day tank (330 gallons) used to feed both generators as per plans, plus 10,000-gallon tank which is used to feed the day tank on the 4th floor.
Filing for facade restoration purposes only. no change to use, egress or occupancy.
Filing herewith plumbing work as per plans filed herewith. No change to use, egress or occupancy.
Existing apartment renovation including partitions, finishes, and appliances. no change in use, egress, or occupancy.
Replacement of the residential cooling tower and condenser water piping. no change to use, egress, or occupancy.
Interior renovation of partitions, ceilings and doors for existing office space including infill of existing stair opening to separate the 46th and 47th floors. No change in use, egress or occupancy.
Installation of new plumbing fixtures and related piping on construction floors 63, 64/marketing floors 73, 74 as shown on drawings filed herewith. No change in use, egress or occupancy.
Modifications to the existing HVAC system on the the 28th and 35th floors as per plans. No changes to Use, Egress, or occupancy.
Filing herewith mechanical work as per plans filed herewith. No change to use, egress or occupancy.