Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Alterations to existing mechancial systems as per plans filed herewith
Sprinkler modifications taking place on the 3rd floor as per plans filed herewith. No change in use, egress or occupancy._
Plumbing modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy.
Shallow foundation work for concrete caisson under equipment hoists on 57th street side.
REPLACEMENT OF 3 TON SPLIT AC SYSTEM SERVING FRONT EAST OFFICE AND 2nd Fl
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc...
INSTALLATION OF 300 psf SIDEWALK SHED AS PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE 2014 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Application filed for mechanical modifications/additions on the 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Mechanical modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Wall structure for exterior banner signs filed under separate application. no change in use, egress or occupancy.
Herewith filing for interior demolition of existing mechanical systems in subcellar #1 as per plans. no change to use occupancy or egress.
Removal of existing finishes and partitions, and installation of new partitions, finishes and fixtures. no change in use or occupancy. no change in storefront or exterior wall. no change to use, egres...
Addition/Modification to existing HVAC System as per plans filed herewith. No change in use, occupancy or egress.
Filing for partition work related to a new place of assembly on the 22nd floor and to remove an existing place of assembly on the 23rd floor.
Remove part of ceiling and reconfigure access panel in mech closet. Provide new suspended ceiling. New access panel. No change in use, egress or occupancy
Hereby filing for the installation of a new mechanical unit and associated ductwork in conjunction with the interior renovation of an existing commercial space. There is no change in use, egress, or o...
General construction modifications taking place on the 32nd floor (33rd floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Equipment use (56 st hoists): installation of dual 7000# capacity personnel hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egres...
Installation and use of temporary construction fence as per plans filed herewith. no change to use, egress or occupancy.