Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc...
Mechanical modifications taking place on the 3rd floor as per plans filed here with. no change in use, egress or occupancy .
Equipment use (57 st hoists): installation of dual 7000# capacity personnel hoists during bldg alteration filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egres...
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary equipment shall com...
Suspended scaffolding for facade restoration as shown on plans
Mechanical work on the cellar, 1st thru 19th floors and roof as indicated on drawings.
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Installation of plumbing fixtures and commericial cooking equipment for take out pizzeria
Plumbing work associated with the renovation of apt 10x. all as per plans and applications. no change in use, egress or occupancy.
Selective removals of non-load bearing partitions, flooring, wall bases, millwork cabinetry/shelving, doors and finishes as per details on plans.
Facade repairs. no change in use, egress or occupancy.
Herewith filing for interior renovation of existing retail store as per plans.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Renovate existing commercail space #1 at 001 no change to use, egress or occupanc
Installation of plumbing fixtures and commericial cooking equipment for take out pizzeria
Removal of existing hvac system in existing rooms and new hvac design for new restrooms and rooms.
Renovate existing commercail space #1 at 001 no change to use, egress or occupanc
Facade repairs. no change in use, egress or occupancy.
Selective removals of non-load bearing partitions, flooring, wall bases, millwork cabinetry/shelving, doors and finishes as per details on plans.
Plumbing work associated with the renovation of apt 10x. all as per plans and applications. no change in use, egress or occupancy.