Building Permits in ZIP 10019
Manhattan, NY — 1,289 permits filed recently
1,289 permits
Structural modifications on floors 11-15 (CWNY) as per plans. No change to use, egress or occupancy.
Filing herewith for the renovation of an existing first-floor commercial space. Scope of work includes removal and installation of interior non-bearing partitions. No changes to use, egress, or occupa...
Replacement of masonry parapet as per plans. no change to use, egress or occupancy.
MSW- 4F ENABLING FOR SURGICAL EXPANSION - plumbing modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Installation of new partitions, doors, ceilings and finishes on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
Interior demolition of all non load-bearing partitions as shown on the demolition plans. all work to be performed in accordance with applicable nyc dob codes and regulations. no change in use, egress...
EREECT ILLUMINATED ACCESSORY BUSINESS D/F BLADE SIGN-A @7th AVE ELEVATION AS PER DRAWING FILE HEREWITH
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Filing herewith for the renovation of an existing first-floor commercial space. Scope of work includes removal and installation of interior non-bearing partitions. No changes to use, egress, or occupa...
Replacement of masonry parapet as per plans. no change to use, egress or occupancy.
Installation of new partitions, doors, ceilings and finishes on floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy.
MSW- 4F ENABLING FOR SURGICAL EXPANSION - plumbing modifications of the 4th floor as shown on plans filed herewith. No change in egress, occupancy or use.
Structural modifications on floors 11-15 (CWNY) as per plans. No change to use, egress or occupancy.
Interior renovation of existing commercial space as per plans. no change in use, occupancy, or egress.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed in conjunction with facade application # M01205377 per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egres...
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Plumbing and sprinkler modifications to accommodate alterations within the existing building as per plans.
Installation of ventilation system on the first floor as per plans filed. no change to use, egress or occupancy.
Installation of new plumbing fixtures and associated piping on the 22nd floor (Hallmark) as per plans. No change to use, egress or occupancy.