Building Permits in ZIP 10019
Manhattan, NY — 1,278 permits filed recently
1,278 permits
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or the sidewalk shed is front of the building at 5 avenue elevation.
Interior renovation of partial 1st floor, ambulatory care/ physical therapy facility in association with alt1 122616302 as per plans filed herewith
Mechanical work at partial 1st floor, ambulatory care/ physical therapy facility in association with alt1 122616302 as per plans filed herewith
Exterior facade and roofing repairs. No change to use, egress, or occupancy.
Sprinkler modifications taking place at cellar as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation of apt. 55a with minor demolition. remove & relocate non load bearing partitions & ceilings per plans. no change in egress, occupancy or use is involved under this application.
Plumbing work filed in conjunction with gc application m01360911-i1 for interior renovation of existing apt. #3l. no change in use occupancy and egress.
Install new commercial kitchen hood system for commercial store on the 1st floor subsequent with dob job#m01301977, no change in use, egress and occupancy.
Sprinkler work (melius) as indicated on plans. no change in use,egress or occupancy.
Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.
Installation of suspended scaffold for facade work and/or inspection. Amend #2, added scaffold drops ,and outrigger detail. Amend #3, added welding detail and overhang beam options. Amend #4, added ct...
Installation of suspended scaffold for facade work or inspection.
IRA to assist with Condition Assessment.
Plumbing work filed in conjunction with GC application M01337286-I1
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in existing masonry chimney...
Plumbing modifications taking place on the 15th floor (16th floor marketing) as per drawings filed herewith. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
The scope of work for this project consist of extending dunnage to accommodate additional HVAC Equipment (filed under DOBNOW applications M01319621, M01319622,M01319603,M01319619). No change in use eg...