Building Permits in ZIP 10019
Manhattan, NY — 1,275 permits filed recently
1,275 permits
Plumbing - Remove existing bathroom plumbing fixtures and provide new. Provide two additional sinks
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Installation of six (6) in-row A/C units, one (1) outdoor adiabatic cooler, and associated piping. New BMS controls system.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the partial 14th floor as per plans filed herewith. no change in use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Filing for modifications to existing plumbing systems at cellar and first floor. There is no change to use, egress or occupancy.
Infill of existing slab opening at 23rd floor.
Mechanical work as shown on plans
General construction work for Interior fit out on 19th floor (23rd floor marketing). Filed in conjunction with HUB Development NB Job # 121206550 reviewed under 2014 code..
Facade repairs as shown on the drawings filed herewith. no change in use, egress or occupancy.
Sprinkler modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Modification to an existing Sprinkler System
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 45th floor as per plans. No change to use, egress or occupancy.
Mechanical work as shown on plans
Interior demolition and alteration including installation of non-load-bearing partitions, ceiling and related finishes. No change to egress, use, or occupancy.
Plumbing - Remove existing bathroom plumbing fixtures and provide new. Provide two additional sinks
Infill of existing slab opening at 23rd floor.
Facade repairs as shown on the drawings filed herewith. no change in use, egress or occupancy.