Filing for modifications to existing plumbing systems at cellar and first floor. There is no change to use, egress or occupancy.
General construction modifications taking place on the 12th floor as per drawings filed herewith. no change in use, egress or occupancy.
Sprinkler modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
plumbing modifications on 11th floor as per plans filed herewith. no changes in use, egress or occupancy.
Installation of (3) air cooled roof top units located on the 2nd floor roof
Underpinning work proposed for a mixed-use building. No change to use, occupancy or egress under this application.
Mechanical modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Removal of interior non-load bearing partitions at first floor retail space. no change in use, egress or occupancy under this application.
Installation of (3) air cooled roof top units located on the 2nd floor roof
Mechanical modifications to take place on the 8th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Underpinning work proposed for a mixed-use building. No change to use, occupancy or egress under this application.
Work to include furnishing and installing sprinkler heads and branch piping and plumbing fixtures and related piping.
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replace illuminated sign on existing marquee (spin)
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Garage repairs at the cellar, first floor, and garage entrance/exit as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Facade repairs as per plans. no change in use, egress or occupancy.
Modification the existing sprinkler system on the 17 floor as per plans. No change to use, egress or occupancy
Installation of temporary suspended scaffolds and material hoist on monorail, per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with t...