Building Permits in ZIP 10021
Manhattan, NY — 781 permits filed recently
781 permits
Modification of an existing sprinkler system. relocation, replacement and installation of new heads to provide adequate coverage to combined buildings. single-family home filed and approved under alte...
interior renovation and conversion of an existing doctors office residential apartment on the 1st floor . scopes of work, including architectural/construction, plumbing and sprinkler system
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.. the sidewalk shed is in front of the building.
Pluming work file in conjunction with apartment #35B renovation. No change to use, egress or occupancy.
Plumbing and sprinkler modifications to accommodate new CT equipment on the 3rd floor including piping on 2nd floor in the existing hospital as per plans filed herewith only.
Modifications to HVAC to accommodate renovations to the Xray suite on partial 5th floor in the existing hospital as per plans filed herewith only.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
interior renovation and conversion of an existing doctors office residential apartment on the 1st floor . scopes of work, including architectural/construction, plumbing and sprinkler system
Retrofit (1) existing combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.. the sidewalk shed is in front of the building.
Sidewalk shed to be installed as per plan. no change in use, egress or occupancy.
Non-illuminated non-advertising accessory wall sign - weill cornell medicine. no change of use, egress or occupancy.
Modification of an existing sprinkler system. relocation, replacement and installation of new heads to provide adequate coverage to combined buildings. single-family home filed and approved under alte...
Mechanical work associated with renovations to existing apartment 14 ABCDE. No change in occupancy, use or egress.
Plumbing work filed in conjunction with the renovation and combination of apartment 7E & 7F as per plans. No change of use, occupancy or egress.
Annex Loading Dock: Modification of HVAC ductwork, piping, and equipment to accommodate the LOADING DOCK HEATING AND COOLING alteration in the existing hospital building as per plans filed herewith. N...
Annex Loading Dock: Modification of HVAC ductwork, piping, and equipment to accommodate the LOADING DOCK HEATING AND COOLING alteration in the existing hospital building as per plans filed herewith. N...
Plumbing work filed in conjunction with the renovation and combination of apartment 7E & 7F as per plans. No change of use, occupancy or egress.
Installation of temporary plywood fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the sidewalk shed columns front of the building.
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy.the sf from the top of the sh and the penthouse terrace past the main roof wall, around the bulkhead, setbac...