Building Permits in ZIP 10021
Manhattan, NY — 775 permits filed recently
775 permits
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 200 east 72nd street, manhattan, ny 10021
Installation of a new pump and heat exchanger for each of the three domestic hot water zones for condensate heat recovery. no change to use, egress, or occupancy.
Minor interior work to existing apartment 15 cd. no change to use, egress or occupancy.
Architectural work associated with the new chillers installation at the Frick Museum. No change of use, egress or occupancy.
Interior renovation of existing apt 4b. no change in use, egress, or occupancy.
Exterior terrace work to include replacement of exterior windows & doors, shed, lighting, pavers and removal of existing pergola. no change to use, occupancy or egress
Installation of hvac equipment, ductwork, and piping for apartment renovation. no change in use, egress or occupancy.
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...
New gas meter room. no change in means of egress, use group or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
New gas meter room. no change in means of egress, use group or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Exterior terrace work to include replacement of exterior windows & doors, shed, lighting, pavers and removal of existing pergola. no change to use, occupancy or egress
Interior renovation of apartment - minor partition work, new doors, appliances, fixtures and finishes, lighting and electrical. No change to use, egress, or occupancy.
Interior renovation of existing apt 4b. no change in use, egress, or occupancy.
SHED installation as per plans filed herewith.
Foundation work for new 23 story mixed use building as per plans filed
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...
Foundation work for new 23 story mixed use building as per plans filed
Renovation of existing cellar floor (680sf)& ground floor (1476sf) retail store with minor demolition and construction of new walls, doors & finishes. lighting is existing to remain with only 1 fixtur...