Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
sprinkler work as shown on plans filed herewith. No change in use egress or occupancy.
General construction work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection
Mechanical modifications and assoicated duct work as per plans. no change in use egress or occupancy.
Combination of apts 11c and 11d as per tppn 3.97 and as per plans filed herewith. no change to use, egress or occupancy
Interior renovations/alterations inclusive of removal and new installation of interior non-bearing partitions and ceiling finishes.
Interior minor alterations inclusive of structural framing, beams, posts and rail support @ new lift location between level 1 & mezzanine.
Installation and use of temporary mini crane as per plans filed herewith. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection
the installation of a 4 ton Mitsubishi City Multi split AC system (ACC1 outdoor unit connected to all 3 indoor units)
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modification/addition to sprinkler system and related piping and installation of Temporary Core Sprinkler protection as shown on drawings. No change in use, egress or occupancy.
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Installation of outrigger for facade repair & inspection.
Installation of interior non-bearing partitions and related finishes, hung ceilings and related work, as per drawings filed herewith filed in conjunction with NB #M00505081. No change in use, egress o...
Filing for sprinkler work associated with the interior renovation of 11th & 12th floors for peerless clothing as per plans submitted herewith.
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.