Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Interior renovation at apt 15a-m on the 15th floor as per plans filed herewith
Removal of ductwork and associated equipment on the 1st floor as indicated on drawings.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Plumbing work filed in conjunction with gc application m01338119-i1 for interior renovation of existing apt. #10cd.
Installation of heavy duty sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th...
Installation of outrigger for facade repair.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Interior renovation of apartment 26C, including new minor partitions, finish materials on the floor, wall and ceiling. All as per accompanying plans. No chance in use, egress or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation at apt 15a-m on the 15th floor as per plans filed herewith
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
General renovation of existing apartment 10cd. interior partition, finish and plumbing work as per plan. no change in use, egress or occupancy.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this applica...
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Suspended Scaffold for Facade Restoration and Material Hoisting as Shown on Plans
General construction work taking place on the 21st floor as per plans filed herewith. no change in use, egress, or occupancy.
Renovate (3) existing bathrooms in apartment #25D. No change in use, egress or occupancy.
Use of knuckleboom for SOE and foundation construction. This application is filed in conjunction with NB M01145329-I1