Interior renovation of apartment 8nc including kitchen and bathroom renovation.
Use of knuckleboom for SOE and foundation construction. This application is filed in conjunction with NB M01145329-I1
Facade repairs. no change in use, egress or occupancy.
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Install of temp scenic partitions and elements, no alt to exist structures, for Tiffany Exhibit. TPA not required, TUP filed as needed. Producer is responsible to monitor site safety. All prod equip r...
Installation of suspended scaffold for facade work or inspection
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 1st floor as indicated on drawings.
Installation of temporary sidewalk shed as per plans. overhead protection shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Mechanical means of Demolition. Demo of Structural Elements can be found under Job M01211696-S8 (Including Slabs and Framing Removal from Sub Cellar through the EMR level). No change in use, egress or...
Installation of system scaffold, and work platform as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
New stair opening at 17th Floor and new convenience stair between 16th & 17th Floors as shown on drawings. No change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Apartment renovation and installation of new finishes (20th floor, apt. 20c). no change in use, egress, or occupancy.
Removal and instillation of interior non load bearing partitions and related finishes of existing business offices. No change in use, egress or occupancy.
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st and 2nd floors. Subsequent plumbing application to be filed. All in accordance with plans. No cha...
Installation of temporary p/m hoist complex as per plans in conjunction with general construction work. no change in use, egress or occupancy. hoist complex shall comply with chapter 33 of nyc buildin...