Building Permits in ZIP 10022
Manhattan, NY — 1,628 permits filed recently
1,628 permits
Modification to Plumbing and Sprinkler Systems as per plans filed herewith.
Interior demolition of non load bearing partitions on the 1st floor and modification of existing storefront as indicated on drawings.
Replace, and relocate sprinkler heads as shown in sp-100,00. no proposed change in use, egressor occupancy under this application.
General construction & structural modifications taking place on facade as per plans filed herewith. no change in use, egress, or occupancy
Removal of some interior non-bearing partitions. minor renovation - painting, beautification, replacement of flooring, in existing commercial space on 1st fl
WCM INTERIOR 5th floor: HVAC DUCTWORK, PIPING AND EQUIPMENT MODIFICATIONS TO ACCOMMODATE THE NEW CLINIC SERVICES IN THE EXISTING BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
General construction for interior renovatioins as shown herewith. no changes to egress, occupancy or use.
General construction & structural modifications taking place on facade as per plans filed herewith. no change in use, egress, or occupancy
General construction modifications taking place on the 1st floor as per drawings filed herewith. no change in use, egress or occupancy.
Partial Demolition of East Facade to create access opening for construction hoist
Apt. #6B, erect minor interior partitions, install new finishes. Plumbing work filed under subsequent S1 application. No change in egress, occupancy or use.
Modifications to mechanical systems as per plans filed herewith filed in conjunction with NB #M00505081. No change of use, occupancy or egress.
Engineered Enclosure System on Scaffolding for Full Building Demolition
Herewith filing for plumbing fixtures modification in apt. 20g as per plans filed herewith. no change in use, occupancy or egress.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Partial Demolition of East Facade to create access opening for construction hoist
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
General construction for interior renovatioins as shown herewith. no changes to egress, occupancy or use.
Replace, and relocate sprinkler heads as shown in sp-100,00. no proposed change in use, egressor occupancy under this application.
General construction & structural modifications taking place on facade as per plans filed herewith. no change in use, egress, or occupancy