Building Permits in ZIP 10022
Manhattan, NY — 1,619 permits filed recently
1,619 permits
Filing herewith plumbing work in conjunction with renovation of existing office. no change in use, egress or occupancy.
New plumbing work apt #31c. in conjunction with # m01339271-i1
Plumbing work associated with renovation of apt 27h, including replacement/relocation of toilets, lavs, showers, tub, sink, and washer/dryer as per plans submitted herewith. no change in use, egress,...
Interior renovations of non-load bearing partitions, replacements of interior finishes at ceiling, wall and floor surfaces, and installation of new LED lighting. No change in use, egress or occupancy.
Replace plumbing fixtures with new at existing roughing (1 wc, 1 lav) at apt 37b on the 36th floor.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Modifications to the existing sprinkler system with installation of a temporary loop on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Modification to Sprinkler Systems as per plans filed herewith.
Modifications to existing sprinkler system as per plans filed herewith. No change in use, egress or occupancy.
Herewith filing General Construction work
Standpipe work related to Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms.
Installation of a temporary work platforms as per plans. no change in use, egress or occupancy. work platforms installed in compliance with 2022 nyc building code, chapter 33.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
East facade repair and restoration including structural work as per drawings submitted herewith. No change in use, egress or occupancy.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Filing herewith renovation of existing office as per plans. no change in use, egress or occpancy.
FILING FOR DEMOLITION OF METAL STAIR FROM 22nd TO 23rd FLOOR. INFILL OF EXISTING SLAB OPENING ON 23rd FLOOR WITH NEW SLAB CONSTRUCTION SUPPORTED BY STEEL BEAMS.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.