Building Permits in ZIP 10022
Manhattan, NY — 1,627 permits filed recently
1,627 permits
relocation of existing sprinkler heads. work on 17th floor only
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Modification of existing mechanical system. Work to include new AC Unit, fan coils, & related ductwork; and toilet and kitchen exhaust, as per plans filed herewith. No change in use, egress or occupan...
Renovate interior of commercial space to coffee shop. Install plumbing fixtures as per plan. No change in egress, occupancy or use is involved under this application.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Combining two units 20a and 20d on the 20th fl, interior renovation, pl work under subsequent filing
Sprinkler work from the 32nd to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy.
Renovate interior of commercial space to coffee shop. Install plumbing fixtures as per plan. No change in egress, occupancy or use is involved under this application.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. sidewalk shed located along the e 54th street and 5th avenue frontage of 3 east 54th street.
Interior office renovation of office space.
relocation of existing sprinkler heads. work on 17th floor only
Interior renovation @ partial 2nd & 3rd floor plan(apts. #2bc ,3b & 3d) in an existing 4 story w/ cellar building. no change in use, egress or occupancy.
Modification of existing mechanical system. Work to include new AC Unit, fan coils, & related ductwork; and toilet and kitchen exhaust, as per plans filed herewith. No change in use, egress or occupan...
Plumbing modifications taking place on the 16th & 17th Construction floor as per plans filed herewith. No change in use, egress or occupancy.
Window replacement work a shown. glass removal and operable window installation. limitedmasonry removal at the sills.
Modification of existing sprinkler system as per drawings filed herewith. no change to use, occupancy, or egress
Removal and installation of interior partitions and doors on floors 4-6 as per plans submitted herewith. No change of use, occupancy or egress under this application.