Building Permits in ZIP 10022
Manhattan, NY — 1,617 permits filed recently
1,617 permits
Mechanical work as shown on plans
General construction for interior partitions and related finishes for floor, wall & ceiling, as per plans filed herewith. no change to use, bulk, egress, or occupancy. is proposed.
Modifications to the existing sprinkler system on the 17th thru 21st floors (Louis Vuitton - North America Fit Out) as per plans. No change to use, egress or occupancy
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Interior renovation scope related to apartment 18A renovation. No change to egress, use or occupancy.
Interior renovation of apartment 10k on the 010 floor. no change in use, occupancy, or egress.
General construction work taking place on 14th and 15th floors as per plans filed herewith. no change in use, egress, or occupancy.
Plumbing modifications as per plans filed herewith. no change to use, bulk, egress, or occupancy is proposed
Modifications to the existing sprinkler system on the 6th floor as per plans. No change to use, egress or occupancy.
Modifications to the existing plumbing system on the 31st floor (Electra USA) as per plans. No change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Removal of plumbing fixtures and capping of piping on the 1st floor as indicated on drawings.
Installation of ductwork, diffusers, and water-source heat pump for a medical office space as per plans filed herewith. NO change in use, egress or occupancy.
Renovations to existing retail store. removal of interior wall cladding and millwork. replace with new drywall system as per plans filed herewith. no change in use, egress or occupancy.
Preparation Work for Full Demolition - Removal of Glass Windows
Installation of temporary scaffold stair tower and construction fence as per plans during general construction work. no change in use, egress or occupancy under this application. construction equipmen...
Installation of a heavy duty sidewalk shed approximately 225'long as per plans in conjunction with general construction work. no change in use, egress or occupancy. sidewalk shed shall comply with 201...
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
Installation of temporary scaffold stair tower and construction fence as per plans during general construction work. no change in use, egress or occupancy under this application. construction equipmen...
Modifications to the existing HVAC system on the 6th floor as per plans. No change to use, egress or occupancy.