Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Debris chute for the interior demolition of 14-story commercial building
Removal of abandoned water tank and installation of plumbing fixtues in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Equipment use for interior demolition of 14-story commercial building
replacement of two water closets, two lavatories, one bath tub, one gas range, one kitchen sink and one washing machine on new roughing, minor relocation of one dishwasher.
At subcellar, installation of new ac units and associated ductwork and piping, supplemental ac unit to serve it room, and new outside air and exhaust fans as per plans filed herewith. no change to use...
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01180602-I1.. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupa...
2nd floor interior renovation combining one dwelling unit and one store into a single residential unit. Work includes non-load-bearing partitions, mechanical, plumbing and electrical work. Change of u...
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
At subcellar, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to use, occupnacy, or egress under t...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Debris chute for the interior demolition of 14-story commercial building
At subcellar, removal and installation of interior partitions, ceilings, finishes, millwork, and interior convenience stairs as per plans filed herewith. no change to use, occupnacy, or egress under t...
Install temporary fire standpipe pressurized alarm system for building being demolished under demo #M01180602-I1.. Cut/cap standpipe riser floor by floor as required. No change to use egress or occupa...
Removal of abandoned water tank and installation of plumbing fixtues in existing 6th floor stair bathroom/locker room. No change in occupancy, use or egress.
New vrf air conditioning units within an existing building. new outdoor condensers in courtyard of building. no change in use or occupancy.
2nd floor interior renovation combining one dwelling unit and one store into a single residential unit. Work includes non-load-bearing partitions, mechanical, plumbing and electrical work. Change of u...
Equipment use for interior demolition of 14-story commercial building
replacement of two water closets, two lavatories, one bath tub, one gas range, one kitchen sink and one washing machine on new roughing, minor relocation of one dishwasher.
Renovation of existing triplex apartment . this alteration will consist of a new kitchen and bathrooms. the existing convenience stairs n the apartment are to be reconstructed as per plans. new exteri...