Building Permits in ZIP 10023
Manhattan, NY — 1,038 permits filed recently
1,038 permits
Interior Renovation of Apt. 12D at the 12th floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing b...
Installation of temporary roof protection/overhead protection as per plan. no change in use, egress, or occupancy. the roof protection and overhead protection at the east neighbor's roof. the ovh over...
Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Interior renovation of apartment 1120 on the 11th floor. no change in use, egress, or occupancy.
Installation of temporary roof protection/overhead protection as per plan. no change in use, egress, or occupancy. the roof protection and overhead protection at the east neighbor's roof. the ovh over...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold at the south (west 63rd st) and west elevations from the top of the sidewalk shed to past...
Erect non-illuminated accessory business banner for equinox
Interior renovation of the school's lobby, gym and other accessory spaces. no change in zoning, occupancy or egress.
Installation of temporary work platform as per plan. no change in use, egress, or occupancy. the work platform on the 17th floor at the southeast corner allows customers to land the suspended scaffold...
Structural work in commercial space for new tenant build out for Alo per plans filed herewith. Work in include trellis support. No change in egress, use or occupancy.
Replacement of existing exterior doors with same in same location as per plans filed herewith. No change in egress, use or occupancy.
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Interior build out in existing commercial space for new tenant Alo. Remove/install non load bearing partitions, flooring, ceilings, finishes and fixtures as per plans filed herewith. No change in egre...
Interior renovation of apartment 1120 on the 11th floor. no change in use, egress, or occupancy.
Interior Renovation of Apt. 12D at the 12th floor, including general construction work. No change to egress, use or occupancy. The proposed work has no effect on the structural stability of existing b...
Install new AC system at APT 9B.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Modifications to existing HVAC system.
Temporary scenic structures for a red carpet event. Removed at the end of the programing. No changes to existing structures, use or egress.