Building Permits in ZIP 10023
Manhattan, NY — 1,042 permits filed recently
1,042 permits
Provide services to support Mechanical equipment removals and new installations
Installation of temporary roof protection as per plans. no change in use, egress or occupancy shall comply with chapter#33 of 2022 the ny building code.
Ansonia endoscopy asc reno - plumbing modifications as per plans filed herewith. no change in use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Added aditional facade restoration inspection (in conjunction with sr22-349) additional repair location added
Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in u...
Use of mechanical demolition equipment during partial demolition, filed separately under M01299104-S3.
Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in u...
Masonry facade work as per plans to address conditions cited in the DOB and OATH Violations and the Cycle 9 FISP report. No change to use , egress, or occupancy.
Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in u...
Masonry facade work as per plans including windowsill work to assess and address ECB Violation 34071255L and DOB VIOL 040791CD1JG01. No change to use, egress, or occupancy.
General construction architectural for the renovation of apartment 3d on the 3rd floor as per plans filed herewith. no change of use, egress, or occupancy.
Installation of 300 psf sidewalk shed, pipe scaffold, pylwood fence, needle beam, roof protection and yodosks as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in u...
Masonry facade work as per plans to address conditions cited in the DOB and OATH Violations and the Cycle 9 FISP report. No change to use , egress, or occupancy.
Use of mechanical demolition equipment during partial demolition, filed separately under M01299104-S3.
Masonry facade work as per plans including windowsill work to assess and address ECB Violation 34071255L and DOB VIOL 040791CD1JG01. No change to use, egress, or occupancy.
General construction architectural for the renovation of apartment 3d on the 3rd floor as per plans filed herewith. no change of use, egress, or occupancy.
Added aditional facade restoration inspection (in conjunction with sr22-349) additional repair location added
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Partial demolition of non-load bearing partitions, doors, floor & wall finishes. New work is new doors, flooring, remodeled Kitchen & Bathroom finishes, hard wired SD/CO detectors. Plumbing to be fill...