Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
Rehab of part rear facade by removing parging, repairing cracked bricks, lintels and sills. reset and recaulk four windows and spot repair parging on the north wall. no change in use, occupancy and eg...
Interior renovation of Atria (Senior Living Facility) Associated with the Mechanical work scope.
Filing to show a renovation in an existing store
Interior renovation of the building, Associated with the Structural Work Scope.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Interior renovation of Atria (Senior Living Facility) Associated with the Mechanical work scope.
Interior renovation of the building, Associated with the Structural Work Scope.
Installation of scaffold as per drawings. scaffold shall comply with chapter #33 of the nyc building code. no change in use, occupancy or egress under this application.
Proposed installation of a temporary sidewalk shed and supported scaffolding as per plans submitted. work shall comply with 2014 building codes, chapter33. no changes in use, egress, or occupancy.
Application filed for exterior stair restoration as per drawings filed herewith.
Outriggers system installation , material hoist and inspection for facade repairs.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Facade repairs, scaffold inspections, 3 men letter
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Replacement of two fixtures in the existing bathroom. Installation of a three-compartment sink and a grease trap. Connection of espresso, ice machine and a hand wash sink. NO GAS WORK, NO SPRINKLER WO...
Installation of temporary suspended scaffold equipment.
Interior renovation of the building associated with the GC scope of work. This ALT-CO application is filed to obtain new CO for the building and supersede open ALT-1 no work application # 110424149. N...
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Application filed for exterior stair restoration as per drawings filed herewith.