Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
9th Cycle FISP Repair. No change to use, egress or occupancy.
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Remove building entrance and vestibule doors and install new doors. Re-tile vestibule and lobby/public hall on cellar level. No change in use, egress or occupancy
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Repairs to exterior wall finishes. No change to use, egress, or occupancy.
Structural work type in conjunction with doc 1 to remove column dividing cellar entry door and widen existing doorway. no change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Repairs to exterior wall finishes. No change to use, egress, or occupancy.
Remove building entrance and vestibule doors and install new doors. Re-tile vestibule and lobby/public hall on cellar level. No change in use, egress or occupancy
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc building code.live...
Structural work type in conjunction with doc 1 to remove column dividing cellar entry door and widen existing doorway. no change to use, egress or occupancy.
Modification and installation of plumbing fixtures, and replacement of gas range with gas cooktop.
New stairs to rec room. Kitchen renov. Openings at rear exterior walls, new windows. Excavate for 8'0 ceiling ht in cellar. Stay back from existing footings. New areaways in rear yard. New mini split...
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2014 building codes chapter 33. no changes in use, egress, or occupancy.
Application to renovate apt 212 with modification of the existing non bearing partitions with new finishes. No change to use, egress or occupancy under this filing.
New stairs to rec room. Kitchen renov. Openings at rear exterior walls, new windows. Excavate for 8'0 ceiling ht in cellar. Stay back from existing footings. New areaways in rear yard. New mini split...
Removal of interior CMU wall for APT
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.