Building Permits in ZIP 10024
Manhattan, NY — 724 permits filed recently
724 permits
Application filed for minor interior non-loadbearing partitions and plumbing fixtures, and related finishes, as per plan.
Installation of mechanical systems for proposed 18 story mixed use building with cellar.
Installation of sprinkler and standpipe systems for proposed 18 story mixed use building with cellar.
Legalization of plumbing fixtures in bathrooms, kitchens, and boiler room, associated with the alteration at the cellar, basement, and 1st floor only. no change to the use, egress, or occupancy.
Legalization of plumbing fixtures in bathrooms, kitchens, and boiler room, associated with the alteration at the cellar, basement, and 1st floor only. no change to the use, egress, or occupancy.
9th cycle FISP repairs. No change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Interior renovation associated with the plumbing scope. no change in use, egress or occupancy
Interior renovation of existing apartments 4Q, 5D & 27B. No change to use, occupancy or egress.
Apartment combination of units 19D/20D per TPPN 3/97 including new floor slab penetration at 20fl for new stair, select window and door doors replacement from interior, interior non-structural partiti...
Installation of suspended scaffold for facade work and/or inspection. amend #1, added outrigger detail and hoist.
Apartment combination of units 19D/20D per TPPN 3/97 including new floor slab penetration at 20fl for new stair, select window and door doors replacement from interior, interior non-structural partiti...
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Interior renovation of existing apartments 4Q, 5D & 27B. No change to use, occupancy or egress.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work and/or inspection. amend #1, added outrigger detail and hoist.
9th cycle FISP repairs. No change to use, occupancy or egress.
Interior renovation associated with the plumbing scope. no change in use, egress or occupancy
Installation of material hoist. Amend #1, change in tieback and anchor for masonry, added Ctwt and tie back to beam detail, and added concrete wall anchor detail