Building Permits in ZIP 10024
Manhattan, NY — 725 permits filed recently
725 permits
Install new sprinkler heads for office space only, as per plan. Use existing standpipe riser as water source.
Installation of temporary suspended scaffold equipment.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation at existing store. no change in use, occupancy or egress.
Installation of suspended scaffold for facade work or inspection
Filing for the installation of sidewalk shed on behalf of contractor
Installation of suspended scaffold for facade work or inspection
PROPOSED DEMOLITION OF THE EXISTING CERAMIC TILE FLOORING; OLD CEILING TILES AND GRID TO BE REMOVED AND INSTALL NEW WORK PLATFORM (9'x35') WITH WATERPROOFING OF FLOORING
Installation of suspended scaffold for facade work or inspection
Filing for the installation of sidewalk shed on behalf of contractor
Installation of suspended scaffold for facade work or inspection
PROPOSED DEMOLITION OF THE EXISTING CERAMIC TILE FLOORING; OLD CEILING TILES AND GRID TO BE REMOVED AND INSTALL NEW WORK PLATFORM (9'x35') WITH WATERPROOFING OF FLOORING
Remove and replaced 2 existing AC split units serving the MDF room on the 2nd floor And provide 2 new ACC-1 & ACC2 on roof remove and replace existing roof type ventilator gooseneck for the Cafeteria....
Interior renovation on apartment 4e on 4th floor including non-structural demolition and installation of interior walls and finishes as indicated on plans filed herewith. no change of use, egress or o...
Garage repairs as per plans submitted herewith. there is no change in use, egress of occupancy.
General construction is proposed in the existing unit #9B on the 9th floor. Subsequent MH, PL, and OT applications to be submitted. All per submitted plans. No changes to use, egress, or occupancy und...
Interior demolition of existing non-bearing gyp. bd. partitions. Installation of new non-bearing partitions, door, frames and finishes. No change in use, occupancy or egress
application filed for plumbing work associated with installation of a new grease trap, floor sinks, floor drains, new waste line piping and water supply lines as necessary existing sprinkler system to...
Install replacement external chimney as per plans. no change in use, egress or occupancy.