Building Permits in ZIP 10024
Manhattan, NY — 731 permits filed recently
731 permits
Ps 009m, installation of temporary boiler breeching / stack, steam, and condensate piping submitting on behalf of contractor in conjunction with dob # 103652370. no change in use, egress, or occupancy...
Interior renovation includes merging Apartment 3DA and 3DB. No change in use, egress and occupancy.
Ps-009m, installation of supported scaffold on the roof submitting on behalf of contractor in conjunction with dob # 103652370 for new chimney liner/s installation. no change in use, egress, or occupa...
Replace existing Roof systems , Parapets, Replacement. Replacement of Steel Lintels at identified locations thruought the school . Raise existing sills at roof bulkheads. as per plans filed herewith.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Interior renovation in apt 7a filed in conjunction with dob now pl. no change to use, occupancy or egress.
Total windows replacement and caulking. As per plans .
Ps 009m, installation of +/- 615 linear feet of temporary 8 feet high chain link fence and +/- 16 linear feet of sidewalk shed submitting on behalf of contractor in conjunction with dob # 103652370 an...
SUB-PL plans filed in conjunction with construction to remove (1) washer/dryer, (1) WC, & (1) sink; install (1) DW & (1) kitchen sink; renovate (4) bathrooms; replace (4) WCs, (7) lavatories, (1) tub,...
Alteration of an existing apartment unit #11a with new partitions, finishes, and appliances. minor window work on secondary facades. no change in use, egress, or occupancy.
Filing application for minor non-structural demolition and construction in cellar portion of duplex commercial unit. All work as per plans filed herewith. No change in use, egress or occupancy.
Refurbishment of existing lobby court yard windows. Existing frames to remain, replacement of glass and mullions only.
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, egress or occupancy.
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, egress or occupancy.
Alteration of an existing apartment unit #11a with new partitions, finishes, and appliances. minor window work on secondary facades. no change in use, egress, or occupancy.
Refurbishment of existing lobby court yard windows. Existing frames to remain, replacement of glass and mullions only.
SUB-PL plans filed in conjunction with construction to remove (1) washer/dryer, (1) WC, & (1) sink; install (1) DW & (1) kitchen sink; renovate (4) bathrooms; replace (4) WCs, (7) lavatories, (1) tub,...
Herewith filing for interior renovation of exisitng apartment # 2 as per plans.no changes to use, egress or occupancy.
Demo in apt 2d filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Remodel apt 4c on the 3rd floor, apt 5a on the 4th floor and apt 6a on the 5th floor. no change in use, egress or occupancy.