Building Permits in ZIP 10025
Manhattan, NY — 734 permits filed recently
734 permits
Interior Renovation of Unit 4BC as per approved plans. No change to Use, Egress or Occupancy under this application.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Exterior facade repairs, waterproofing, brick replacement, pointing, lintel repairs. No change in use egress or occupancy
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Exterior facade repairs including brick rebuilding, parapet rebuilding, cut and point, lintel replacement and window sill repairs
Removal and installation of plumbing fixtures and related piping as shown on the plan set filed herewith. No change to use, egress, or occupancy under this application.
Masonry facade repairs and replacing flat roofing at the one story extension. No change to use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Gutt renovation of apartment 5an. minor partition and plumbing alteration. no change in use, egress or occupancy.
Minor interior renovation at apt 10b including partitions, cabinets, fixtures and finishes. no change to building occupancy, egress or floor area.
1. New mechanical mezzanine between 1st & 2nd Floor. 2. First Floor partial demolition and reframing 3.Cellar and First Floor slab infill 4. New elevator.
Proposed exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.
Proposed exterior facade restoration as per plans filed herewith. no change in use, egress or occupancy.