Building Permits in ZIP 10025
Manhattan, NY — 723 permits filed recently
723 permits
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Interior renovation consisting of Removal of convenience stair and removal and installation of non-load bearing partition walls, doors, floors, etc as shown on plan set filed herewith. No change in us...
Plumbingfiling for apartment 20u. plumbing work as per plans. general construction filed under job #140867738. no change in use, occupancy or egress.
1. replace the existing stucco at rear and east side approximately=3600 sf. 2. replace the crack brick at rear and east side approximately= 250 pcs. 3. install new window caulking at rear and east sid...
Interior renovation of apartment 22fg on 21st floor including non-structural demolition and instllation of new interior partitions and finishes as indicated on plans filed herewith. no change of use,...
Installation of suspended scaffold for emergency exterior facade repairs and facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress...
Interior Renovation of Building's Common Hallways, First Floor entry Foyer & stairwells with New Gypsum Finishes and LED Ligthing. No work to be Done in Units.
Minor repairs to existing facade. no change of use, egress or occupancy.
Installation of (3) air cooled split systems located on the 35th floor roof.
Interior Renovation of Building's Common Hallways, First Floor entry Foyer & stairwells with New Gypsum Finishes and LED Ligthing. No work to be Done in Units.
Minor repairs to existing facade. no change of use, egress or occupancy.
Plumbing work in conjunction with interior fit out of bank building
Installation of suspended scaffold for emergency exterior facade repairs and facade inspection. suspended scaffold shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress...
Interior renovation of apartment 22fg on 21st floor including non-structural demolition and instllation of new interior partitions and finishes as indicated on plans filed herewith. no change of use,...
1. replace the existing stucco at rear and east side approximately=3600 sf. 2. replace the crack brick at rear and east side approximately= 250 pcs. 3. install new window caulking at rear and east sid...
Installation of (3) air cooled split systems located on the 35th floor roof.
Installation of suspended scaffold for facade work or inspection.
Proposed plumbing work for commercial space of existing mixed residential & commercial building as per plan. No change in use, egress, or occupancy.
Proposed sprinkler and plumbing work in conjunction with application #120090356 in existing 7-storymixed use building.
Plumbing work related to the interior renovation of apartment 9g on the 9th floor. no change to use, egress, or occupancy.