Building Permits in ZIP 10025
Manhattan, NY — 723 permits filed recently
723 permits
installation of construction fence to protect site, during full demolition
Plumbing work in apt 37
Masonry facade work as per plans. No change to use, egress, or occupancy.
Masonry facade work as per plans. No change to use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection
Installation of vrf system for heating & cooling as per plans.
installation of construction fence to protect site, during full demolition.
New breaching. no change in means of egress, use group or occupancy.
Propose ADA lift at 001 floor (Lobby). Install a new inclined platform lift in main Lobby over existing steps, all as per plans herewith filed. No change in use, egress or occupancy filed under this a...
Install (1) new gas fired hot water heater with integral burner and (1) new storage tank. reconnect low pressure gas line. no change in means of egress, use group or occupancy.
IRA to assist with Condition Assessment
Installation of suspended scaffold for facade work or inspection. Amend #5, added scaffold drops
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with BC2022 chapter 33. No change in use, egress and/or occupancy under this application.
Ch/ps75m - for temporary construction equipment(chute) submitting on behalf of contractor, related to dob# m00951923 no change in use, occupancy or egress
File-supported pipe scaffold as shown on the plan. no change in use, egress, or occupancy under this application.
Ch/ps75m - for temporary construction equipment(chute) submitting on behalf of contractor, related to dob# m00951923 no change in use, occupancy or egress
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with BC2022 chapter 33. No change in use, egress and/or occupancy under this application.
Propose ADA lift at 001 floor (Lobby). Install a new inclined platform lift in main Lobby over existing steps, all as per plans herewith filed. No change in use, egress or occupancy filed under this a...
IRA to assist with Condition Assessment
Install (1) new gas fired hot water heater with integral burner and (1) new storage tank. reconnect low pressure gas line. no change in means of egress, use group or occupancy.