Building Permits in ZIP 10025
Manhattan, NY — 728 permits filed recently
728 permits
Relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Temporary Structural Bracing of beams in unit PH601. Initial General Construction and subsequent Structural application have been filed. No changes to Use, Egress, or Occupancy.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
VERTICAL ENLARGEMENT OF EXISTING MUSEUM TO INCLUDE NEW COMMUNITY TERRACE. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
General construction related to the relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Msm sp n - sprinkler modifications according to plans filed herewith. no change to use egress or occupancy.
interior renovation of apt. 10S demolition and construction of misc. non-bearing partitions, gypsum board ceilings and soffits, fittings and finishes, lighting, switching and electrical as per plan. n...
General construction related to the relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
Relocation of cold water domestic distribution from roof to cellar. installation of pressure boosting system. no change in egress or occupancy.
VERTICAL ENLARGEMENT OF EXISTING MUSEUM TO INCLUDE NEW COMMUNITY TERRACE. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
Temporary Structural Bracing of beams in unit PH601. Initial General Construction and subsequent Structural application have been filed. No changes to Use, Egress, or Occupancy.
Application file to exist. chimney remove and replace new double wall stainlesssteel exterior chimney from basement-boiler room to be extended 4 feet above parapet wall as per plan. hpd omo#no change...
Pl work in apt 3b filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
Facade repair as per plans. filed for facade work permit only. no change in use, egress, or occupancy.
Pl work in apt 3b filed in conjunction with dob now pl and mh. no change to use, occupancy or egress.
Facade repair as per plans. filed for facade work permit only. no change in use, egress, or occupancy.