Construction fence as per drawings during nb construction filed, sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permi...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior demolition of non-loading partitions on the 3rd floor office space as per plans filed herewith. no change in use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Construction fence as per drawings during nb construction filed, sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permi...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Temporary roof-overhead protection at adjoining properties during nb const, filed sep. roof-overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this...
Proposed filing of Sprinkler Work
Interior renovation of existing two-family building. Work to include non-structural demolition, general construction & finishes, replacement of rear facade windows in existing openings, as per plans f...
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
interior renovation for dwelling unit #2 in existing residential building. no change in bulk , use, occupancy or egress of building is proposed under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Interior renovation at the cellar and basement to create an eating and drinking establishment.work includes installation of new mechanical system, fire supression system and plumbing work to accomodat...
Plumbing woork for residential building
Existing parking garage levels reconstruction and repairs throughout and as necessary. All work per plans submitted. No change in use, occupancy or egress proposed under this application.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.