Building Permits in ZIP 10027
Manhattan, NY — 536 permits filed recently
536 permits
Facade repairs. No change in use or occupancy.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Facade repairs. No change in use or occupancy.
General construction work for a pool renovation. No change to use, egress or occupancy.
Installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc
Structural application filed for partial demolition and shoring work to remedy dangerous conditions due to partial collapse. No change to use, egress or occupancy.
Installation of scaffold for exterior work at building facades
Removal existg. gas water heater. installation of new electric water heater
ALT-CO filed herewith to renovation of existing multifamily residential building, 4 stories over basement plus cellar to obtain the new certificate of occupancy.
Sh/ps129m - for temporary construction equipment (shed)submitting on behalf of contractor, in conjunction with dob #104213478. no change in use,occupancy or egress
Alt-co filed to increase the total number of dwelling units from nine to ten units. proposed interior renovation as per plans filed. new c of o to be obtained.
Filed for interior & exterior renovations of existing non elevator prior-to-1968 code, class 3-nfp multiple dwelling as per plans filed herewith; no change proposed to use, egress, or occupancy.
ALT-CO filed herewith to renovation of existing multifamily residential building, 4 stories over basement plus cellar to obtain the new certificate of occupancy.
Sh/ps129m - for temporary construction equipment (shed)submitting on behalf of contractor, in conjunction with dob #104213478. no change in use,occupancy or egress
Redevelopment of buildings 10 and 12 at outside premises (osp), including site improvements as part of building renovations. no change to use, egress or occupancy.
Redevelopment of buildings 10 and 12 at outside premises (osp), including site improvements as part of building renovations. no change to use, egress or occupancy.
Suspended Scaffold Installation for Facade Restoration and Inspection
Installation of temporary suspended scaffold equipment.
Cut and point bricks, and rebuild brickwork in various locations. Replace damaged window sills. Scrape prime and paint A/C louvers.
Filed for interior & exterior renovations of existing non elevator prior-to-1968 code, class 3-nfp multiple dwelling as per plans filed herewith; no change proposed to use, egress, or occupancy.