Building Permits in ZIP 10028
Manhattan, NY — 694 permits filed recently
694 permits
Application filed for plumbing work, as per plans. no change to use, egress or occupancy.
Renovation of apartment 11n on 11th floor. no change to occupancy, use or egress.
Executive offices. modify existing sprinkler system in conjunction with building alteration.
Mechanical work for the renovation of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Renovation of ext'g tenant space - Chipotle. Work to include Storefront, Interior partitions ceiling, soffit, floor & wall finishes, equipment, Furniture,Graphics, new interior ramp,structural platfor...
Remove and replace existing plumbing fixtures and existing gas range at apartment 17B. Install new Washer/Dryer.
Renovation of ext'g tenant space - Chipotle. Work to include Storefront, Interior partitions ceiling, soffit, floor & wall finishes, equipment, Furniture,Graphics, new interior ramp,structural platfor...
Remove and replace existing plumbing fixtures and existing gas range at apartment 17B. Install new Washer/Dryer.
Renovation of apartment 11n on 11th floor. no change to occupancy, use or egress.
Executive offices. modify existing sprinkler system in conjunction with building alteration.
Application filed for plumbing work, as per plans. no change to use, egress or occupancy.
Mechanical work for the renovation of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Facade Repairs. No change in use egress or occupancy under this application.
Install new Planters on existing terraces as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of (24) sp heads at cellar, (17) on 1st fl, (19) on 2nd fl, (18) on 3rd fl, (19) on 4th fl, (15) on 5th fl, (11) on 6th fl. installation of 56 plumbing fixtures.
Sidewalk Shed installation as per plans filed herewith.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Facade Repairs. No change in use egress or occupancy under this application.
Installation of (24) sp heads at cellar, (17) on 1st fl, (19) on 2nd fl, (18) on 3rd fl, (19) on 4th fl, (15) on 5th fl, (11) on 6th fl. installation of 56 plumbing fixtures.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.