Building Permits in ZIP 10029
Manhattan, NY — 590 permits filed recently
590 permits
Plumbing-related work for Elevator Bulkhead Extension & Systems Upgrade. Work includes installation of new sump pumps at elevator pits. No change to use, egress, or occupancy
Filing for plumbing work as per plans
Ps 102m, installation of chain link fence, sidewalk shed, and scaffold in conjunction with dob # 104204424 no change in use, egress, or occupancy.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing for plumbing work as per plans
Filing interior renovation at 5th floor Apartment #5A as per plans with structural filed as a subsequent #M01312123-S1. No change in use, egress, or occupancy under this application.
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Ps 102m, installation of chain link fence, sidewalk shed, and scaffold in conjunction with dob # 104204424 no change in use, egress, or occupancy.
Plumbing-related work for Elevator Bulkhead Extension & Systems Upgrade. Work includes installation of new sump pumps at elevator pits. No change to use, egress, or occupancy
Temporary roof / overhead protection at adjoining properties during nb const, filed sep. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under...
Replacement of existing gas dryers in existing laundry room. minor non-structural demolition of interior partition walls. no change in use, egress, or occupancy.
Replacement of existing gas dryers in existing laundry room. existing ductwork to be replaced in its entirety at laundry room. no exterior work is proposed.
Sh/ps72m - for temporary construction equipment (emergency shed) submitting on behalf of contractor, related llw number #137343 no change in use,occupancy or egress
Interior renovation of existing medical office msh imi 5
NYCHA BOILER-CARVER_BLDG #5_Remove and replace existing steam boiler plant with new boiler plant.
BLDG#2_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
BLDG#4_Remove exist steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas piping...
Installation and use of temporary construction fence as per plans filed herewith. no change in use, egress, or occupancy.
Structural modifications for infrastructure improvements as per shown on plans filed herewith. no change in use, egress or occupancy.
BLDG#7_Remove existing steam-fired domestic hot water heat exchanger, and install new gas water heaters, storage tank, all necessary accessories and valves. Install new gas meter assembly and gas pipi...