Building Permits in ZIP 10029
Manhattan, NY — 590 permits filed recently
590 permits
Erect accessory business wall sign for wing stop, no change in use, egress, or occupancy.
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...
Lehman boiler upgrade, mechanical modifications for said scope as per plans. no change in use egress or occupancy.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed o...
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...
Temporary needle beam platforms as per drawings. needle beam platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of a temporary sprinkler fire protection system on a white-box area located on the 13th floor as per plans submitted herewith, no change in use, egress or occupancy group.
Install illuminated wall sign. No change in use, occupancy, egress
Exterior masonry repairs. no change in use, occupancy or egress under this application.
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...
Install illuminated wall sign. No change in use, occupancy, egress
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration. Replacement of existing entrance with new reinforced concrete walls, and slab for new cellar hatch with vertical ladder...
SECOND AVENUE SUBWAY PHASE 2 PROGRAM - Filing to undergo cellar door alteration, vault removal & building strengthening/protection. Replacement of existing entrance with new reinforced concrete walls,...
Lehman boiler upgrade, mechanical modifications for said scope as per plans. no change in use egress or occupancy.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others for fence installed o...
Installation of a temporary sprinkler fire protection system on a white-box area located on the 13th floor as per plans submitted herewith, no change in use, egress or occupancy group.
Temporary needle beam platforms as per drawings. needle beam platforms shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.