Building Permits in ZIP 10030
Manhattan, NY — 222 permits filed recently
222 permits
Limited exterior repair & roof replacement in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Limited exterior repair & roof replacement in conjunction with renovation of 5-story nycha multiple dwelling throughout. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy. the sidewalk shed is ath adam clayton powell jr blvd elevation.
Structural work of 5-story nycha multiple dwelling as part of the nycha pact renovation: reinforcement and repair of concrete slab at vestibule. no change to use, egress, or occupancy
Structural work of 5-story nycha multiple dwelling as part of the nycha pact renovation: reinforcement and repair of concrete slab at vestibule. no change to use, egress, or occupancy
Application filed for the renovation of existing multiple dwelling as per plans. work to include local foundation work
Installation of 39.69 kw solar energy system on roof. No change of occupancy, use or egress.
Application filed for the renovation of existing multiple dwelling as per plans. work to include local foundation work
Structural work of 5-story nycha multiple dwelling as part of the nycha pact renovation: reinforcement and repair of concrete slab at vestibule. no change to use, egress, or occupancy
Installation of 39.69 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy. the sidewalk shed is ath adam clayton powell jr blvd elevation.
Structural work of 5-story nycha multiple dwelling as part of the nycha pact renovation: reinforcement and repair of concrete slab at vestibule. no change to use, egress, or occupancy
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the building face at the west 142nd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the building face at the west 142nd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at building face at west 139th street elevation
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at building face at west 142nd street elevation
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at the west 143rd street elevation, the back of the building, and on both sides of the...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed at the front of the building on adam clayton powell blvd.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed is at building face at west 143rd street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy. the sidewalk shed at adam calyton power blvd elevation front of the building.