Building Permits in ZIP 10036
Manhattan, NY — 939 permits filed recently
939 permits
Full demolition to a two story building
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Minor interior renovation of suite 909. no change to use, occupancy or egress.
Mh work filed in conjunction with dob now gc, sp, and pl. no change to use, occupancy or egress.
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Temporary structures and temporary changes to the Theater for the run of the show CATS at Broadhurst Theater. No change to use, egress, or occupancy.
Full demolition to a one story building
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
Modifications to the existing sprinkler system on the 14th and 17th Floors (ICBC), as per plans. No change to use, egress, or occupancy.
General construction restaurant rosa mexicano renovations including replacement of interior finishes & equipment as per plans filed herewith. no change in use, egress or occupancy.
Structural modifications as per plans filed herewith. No change in use, egress or occupancy.
Temporary structures and temporary changes to the Theater for the run of the show CATS at Broadhurst Theater. No change to use, egress, or occupancy.
Minor interior renovation of suite 909. no change to use, occupancy or egress.
Modifications to the existing sprinkler system on the 14th and 17th Floors (ICBC), as per plans. No change to use, egress, or occupancy.
General construction restaurant rosa mexicano renovations including replacement of interior finishes & equipment as per plans filed herewith. no change in use, egress or occupancy.
Full demolition to a one story building
Modifications to the existing HVAC system on the 12th and 25th floors as per plans. No change to use, egress or occupancy.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.