Building Permits in ZIP 10036
Manhattan, NY — 939 permits filed recently
939 permits
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Inspect site conditions for telecom upgrade
Installation of suspended scaffold for facade work or inspection.
Provide water and sanitary supply to new plumbing fixtures in new restrooms, pantries and kitchen. Reconnection of existing gas piping to kitchen on 40th, 9 fixtures. Removed all existing sprinkler he...
Minor interior demo, remove soffit and finishes. Install new ceiling, elevator door, wood base and finishes on the 11-13th Floors as per plans (RG _ Elevator Work.) No change to use, egress or occupan...
Replace stucco as shown on plans.
Replace special gas vent from existing water heaters to roof.
Mh work of apt 3b filed in conjunction with dob now gc and pl. no change to use, occupancy or egress.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Installation of suspended scaffold for facade work or inspection.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of heavy-duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code.
Minor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.
Installation of shoring, netting, facade and garage repairs as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Minor Interior Demolition on Cellar,1-5 floors as per plans. No change to use, egress or occupancy.