Building Permits in ZIP 10036
Manhattan, NY — 945 permits filed recently
945 permits
Installation of temporary sidewalk shed & plywood fence &barrier as per plan. no change in use,egress or occupancy
Proposed installation of 1 illuminated, non flashing, accessory business sign. wording central perk coffee co.
Roofing replacement above structural deck as per plans filed herewith.
Full demolition to a two story building
Installation of 14.96 kw solar energy system on roof. No change of occupancy, use or egress.
Facade repairs and window seal replacement. no change in use egress or occupancy
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at west 42nd street, west 43rd street, and west plaza elevations.
Interior renovation at commercial space at 1st and 2nd floors as per plans filed herewith
Structural work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Interior renovation of existing commercial building lobby; minor partition work, new wall finishes & new lighting fixtures throughout proposed under this application. there is no proposed change of us...
Full demolition to a four story building
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Interior renovation of existing commercial building lobby; minor partition work, new wall finishes & new lighting fixtures throughout proposed under this application. there is no proposed change of us...
Interior renovation at commercial space at 1st and 2nd floors as per plans filed herewith
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of 14.96 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of temporary custom color sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed is at west 42nd street, west 43rd street, and west plaza elevations.
Structural work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Facade repairs and window seal replacement. no change in use egress or occupancy
Full demolition to a four story building