Building Permits in ZIP 10036
Manhattan, NY — 939 permits filed recently
939 permits
Structural modifications on floors 2-8 as per plans filed herewith. No changes in use, egress or occupancy.
temporary wood construction fence - pasta de pasta
Scope: nonstructural interior alteration at level 1 luggage and gift shop for installation of new door and partition. at level 2 meeting room, remove and replace partition. no floor plan alterations....
Propose to perform interior renovations. No change in use, egress or occupancy.
Mechanical work for Liberty Mutual on 10th floor
Filing herewith standpipe work to include repairs to Grace fire pump room. No change in use, egress or occupancy.
Interior modifications: Installation of new partitions, doors, suspended ceilings, flooring and finishes on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
General construction on floors 3-10 as per plans filed herewith. No changes in use, egress or occupancy.
Hereby filing to remove, replace, and install new plumbing fixtures with related piping for tenant fit out as shown on plans filed herewith.
Hereby filing to replace and install new plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to replace and relocate plumbing fixtures for tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Install exterior illuminated wall sign (miami shanghai milan berlin)
Ttd -const. fl 41 / marketing fl 43 - filing herewith for the addition/modification to an existing sprinkler system as shown on plans. there will be no change of use, occupancy or egress under this ap...
Mechanical work for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Modifications to the existing sprinkler system on the 19th & 20th Floors (Lockton), as per plans. No change to use, egress, or occupancy.
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 5th Floor as per plans (MUFG Renovations.) No change to use, egress or occupancy.
renovation of existing first floor commercial space
General construction for Steptoe on marketing floors 43,44 & 45 (construction floors 42,43 & 44)
Install exterior illuminated wall sign (u.s. polo assn.)
Ttd - const. fl 40 / marketing fl 42 filing herewith for the addition/modification to an existing sprinkler system as shown on plans. there will be no change of use, occupancy or egress under this app...