Building Permits in ZIP 10036
Manhattan, NY — 955 permits filed recently
955 permits
Installation of 14.96 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Proposed interior alteration at cellar, first floor, mezzanine for renovation of apartment 1h
Renovation and minor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 31-33, as per plans. No change to use, egress, or occupancy.
Proposed interior alteration at cellar, first floor, mezzanine for renovation of apartment 1h
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
Installation of new business accessory awning at osp as per plan. no change in use, occupancy or egress.
Modifications to the existing HVAC system on the 31st - 33rd Floors, as per plans. No change to use, egress, or occupancy.
Renovation and minor interior demolition of existing office space including interior partitions, doors, suspended ceilings on Floors 31-33, as per plans. No change to use, egress, or occupancy.
Mechanical work on the 1st floor (bike room) as indicated on drawings.
Propose plumbing and sprinkler work as per drawings. No change in use, egress or occupancy.
Modification to the existing plumbing system on the 4-16 floors as per plans. No change to use, egress or occupancy.
Installation of new plumbing fixtures and associated CW/sanitary piping on the 23rd and 24th Floors as per plans (Mayer Brown.) No change to use, egress or occupancy.
Installation of new plumbing fixtures and associated CW/sanitary piping on the 23rd and 24th Floors as per plans (Mayer Brown.) No change to use, egress or occupancy.
Modification to the existing plumbing system on the 4-16 floors as per plans. No change to use, egress or occupancy.
Mechanical work on the 1st floor (bike room) as indicated on drawings.
Propose plumbing and sprinkler work as per drawings. No change in use, egress or occupancy.
Installation of temporary needle beam as per plans. no change in use, egress or occupancy.
Filing herewith mechanical work for retail space as per plans. no change in use, egress, or occupancy.