Building Permits in ZIP 10037
Manhattan, NY — 160 permits filed recently
160 permits
Pl;umbing work at the cellar mechanical room
Pl;umbing work at the cellar mechanical room
Plumbing work at cellar mechanical room
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Renovation of cellar mechanical room - nycha boilers
Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladding, lintels, gravel...
Herewith filing demo & construction work as per plans. no change in use, egress or occupancy.
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Herewith filing demo & construction work as per plans. no change in use, egress or occupancy.
Harlem Hospital, MLK Bldg exterior facade & roof level repairs as per the plans filed including: Removal, repairs/replacement of cracked masonry, stone cladding w/metal panel cladding, lintels, gravel...
Renovation of cellar mechanical room - nycha boilers
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WORK PER PLAN
Install approximately 270lf of construction fecne, 20 lf of sidewalk shed & 325 lf of supported scaffold around hansborough recreation center building
Renovation of the mechanical room at the cellar
Installation of steam and condensate piping to two temporary boilers as per plans filed herewith.
Renovation of mechanical equipment at cellar mechanical equipment room as shown on drawings provided.
Install approximately 270lf of construction fecne, 20 lf of sidewalk shed & 325 lf of supported scaffold around hansborough recreation center building
Installation of steam and condensate piping to two temporary boilers as per plans filed herewith.
Renovation of mechanical equipment at cellar mechanical equipment room as shown on drawings provided.