Building Permits in ZIP 10038
Manhattan, NY — 427 permits filed recently
427 permits
Non-illuminated non-advertising accessory banner on fence for pace university - in property lines. no change of use, egress or occupancy.
Mechanical work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Lmh ct 187: modification of interior partitions and finishes to accommodate alterations within the existing hospital building as per plans. no change to use, egress or occupancy.
Temporary Installations to be used on a temporary event Pier 17 Rooftop Summer Concert Series. All the Installations are to be removed upon completion of the event.
General construction for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Mechanical work for office renovation for Cohen Milstein Toll on 21st marketing level (20th construction)
Lmh ct 187: modification of interior partitions and finishes to accommodate alterations within the existing hospital building as per plans. no change to use, egress or occupancy.
Temporary Installations to be used on a temporary event Pier 17 Rooftop Summer Concert Series. All the Installations are to be removed upon completion of the event.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Demolition of all existing equipment, duct work and risers
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Full Demolition of a 4 1/2-Story Residential Building
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....
Demolition of all existing equipment, duct work and risers
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Full Demolition of a 4 1/2-Story Residential Building
Remove existing Roof drains/piping, replace with new drain, piping and flashing. Re-flash, wire brush, repaint existing vent stack. Replace Fire pump including piping, fittings, valves and controller....