Building Permits in ZIP 10065
Manhattan, NY — 841 permits filed recently
841 permits
Installation of industrial rope access for facade inspections.
F bldg sp ph3: modification of interior finishes and ceilings to accommodate the sprinkler upgrades within the existing hospital building as per plans. no change to use, egress or occupancy.
L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Installation of an illuminated business accessory sign . no change in use, egress or occupancy.
F bldg sp ph3: modification of interior finishes and ceilings to accommodate the sprinkler upgrades within the existing hospital building as per plans. no change to use, egress or occupancy.
L-4 CARDIOLOGY Phase 3: HVAC MODIFICATIONS TO ACCOMMODATE THE PHASE 3, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY.
Foundation and earthwork related to the construction of a new high rise residential building
Installation of an illuminated business accessory sign . no change in use, egress or occupancy.
Installation of industrial rope access for facade inspections.
Installation of outrigger beam to perform facade repairs and facade inspections
L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR O...
Application filed for mechanical additions/modifications on the partial 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Application filed for mechanical additions/modifications on the partial 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
L4 CARDIOLOGY Phase 2: PLUMBING AND SPRINKLER MODIFICATIONS TO ACCOMMODATE THE PHASE 2, CARDIOLOGY, IN THE EXISTING HOSPITAL BUILDING AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR O...
Installation of outrigger beam to perform facade repairs and facade inspections
New slab opening in B4 level for ductwork.
2 Boiler installation in conjunction with Alteration
Replace existing air handling unit and associated ductwork and piping in B4 and B3 levels.
Interior Renovation of an existing apartment that includes bedroom, kitchen and bathroom. Existing fixtures and appliances to be replaced. New washer/dryer to be installed. No change to egress use or...
Interior Renovation of an existing apartment that includes bedroom, kitchen and bathroom. Existing fixtures and appliances to be replaced. New washer/dryer to be installed. No change to egress use or...