Building Permits in ZIP 10065
Manhattan, NY — 843 permits filed recently
843 permits
Installation of Illuminated Exit Signage at Common Areas (Interior of residential bldg portions only). No change to use, egress, or occupancy.
Hereby filing for the renovation of unit #9c. no change in use, egress or occupancy.
Hereby filing for the renovation of unit #9c. no change in use, egress or occupancy.
Replace plumbing fixtures with new at existing roughing (1 sink, 1 dw) at apt 3b on the 3rd floor
Modifications to the existing mechanical system per plans filed herewith. No changes in use, egress or occupancy.
Installation of temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replace plumbing fixtures with new at existing roughing (1 sink, 1 dw) at apt 3b on the 3rd floor
Hereby filing for the renovation of unit #9c. no change in use, egress or occupancy.
Installation of Illuminated Exit Signage at Common Areas (Interior of residential bldg portions only). No change to use, egress, or occupancy.
Installation of temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Modifications to the existing mechanical system per plans filed herewith. No changes in use, egress or occupancy.
Architectural and minor mechanical scope associated with the renovation of apt. 11B. No change of use, egress, or occupancy.
Architectural and minor mechanical scope associated with the renovation of apt. 11B. No change of use, egress, or occupancy.
Proposed installation of pipe scaffolding as per plan and in accordance with chapter 33 of nyc 2014 building code. no change in use, egress or occupancy.
Removal of sprinkler system in association with full building demolition, by others. there is no change to use, egress, or occupancy.
Gp6 picu: structural work to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Gp7 ped surgery: structural work to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.
Proposed installation of pipe scaffolding as per plan and in accordance with chapter 33 of nyc 2014 building code. no change in use, egress or occupancy.
Removal of sprinkler system in association with full building demolition, by others. there is no change to use, egress, or occupancy.
Gp6 picu: structural work to accommodate the pediatric icu renoavtion, greenberg pavilion, in the existing hospital building. no change to zoning, use, egress or occupancy.